| Questions | Correct Answers |
|---|---|
| 1. What is primary aim of the National Green Hydrogen Mission? | To reduce dependence on fossil fuel imports |
| 2. Which of the following is NOT a component of the NGH Mission's infrastructure development? | Nuclear reactors |
| 3. What is the primary focus of the Strategic Interventions for Green Hydrogen Transition (SIGHT) programme? | Incentives for production of green hydrogen and electrolysers |
| 4. The Strategic Hydrogen Innovation Partnership (SHIP) aims to build a fund for what purpose? | Research and Innovation in hydrogen technologies |
| 5. What is the primary source of green hydrogen? | Electrolysis of water using renewable energy |
| 6. Which renewable energy sources are commonly used to produce green hydrogen? | Wind and solar |
| 7. What is the main advantage of green hydrogen over grey hydrogen? | Zero carbon emissions during production |
| 8. What byproduct is generated during the electrolysis of water for green hydrogen production? | Oxygen |
| 9. What is "blue hydrogen"? | Hydrogen produced from natural gas with carbon capture and storage |
| 10. Which of the following is a derivative of green hydrogen that can be used as an energy carrier? | Ammonia |
| Questions | Correct Answers |
|---|---|
| 1. Designated nodal agency for green hydrogen in Gujarat? | GPCL |
| 2. Which state has the highest installed rooftop solar capacity in India? | Gujarat |
| 3. Which of the following renewable technologies directly produces AC power? | Wind Turbine |
| 4. What is the typical lifespan of a solar PV module? | 20–25 years |
| 5. Solar trackers improve system energy yield by: | Orienting panels toward the sun |
| 6. What does PPA stand stand for in renewable energy projects? | Power Purchase Agreement |
| 7. Wind power generation depends primarily on: | Air density and wind velocity |
| 8. Offshore turbines generate more power because: | All of the above |
| 9. Most common type of battery used in grid-scale renewable plants: | Li-ion (LFP/NMC) |
| 10. BESS supports grid by: | All of the above |
| 11. Battery energy is measured in: | MWh |
| 12. Pumped hydro storage stores energy as: | Potential energy |
| 13. Harmonics in grid-tied PV systems are mainly introduced by: | Inverters |
| 14. Which state has the highest installed wind power capacity in India? | Gujarat |
| 15. Designated nodal agency for offshore wind development in Gujarat under GoG? | GPCL |
| 16. Gujarat Renewable Energy Policy–2023 aims to achieve what % RE capacity by 2030? | 50% |
| 17. Estimated solar energy potential in Gujarat (RE Policy–2023)? | 36 GW |
| 18. Estimated wind energy potential in Gujarat (RE Policy–2023)? | 143 GW |
| 19. One objective of Gujarat RE Policy–2023 is to reduce dependence on: | Conventional power and fossil fuels |
| 20. Which coastal zone of Gujarat is identified as the prime location for offshore wind development? | Gulf of Khambhat |
| Questions | Correct Answers |
|---|---|
| What is the capacity range of renewable energy power plants under Component-A of the PM-KUSUM Scheme? | 500 kW to 2 MW |
| Which component of the PM-KUSUM Scheme supports the installation of stand-alone solar agriculture pumps? | Component-B |
| What is the Central Financial Assistance (CFA) provided for Components B and C of the PM-KUSUM Scheme in general regions? | 30% |
| For North Eastern States, Sikkim, J&K, Himachal, Uttarakhand, Lakshadweep, and A&N Islands, what is the CFA provided for Components B and C of the PM-KUSUM Scheme? | 50% |
| Under Component-C of the PM-KUSUM Scheme, what can farmers do with the excess solar power generated after meeting their irrigation needs? | Sell it to DISCOMs at a pre-fixed tariff |
| What is the percentage of State Government subsidy for Components B and C in general regions under the PM-KUSUM Scheme? | 30% |
| What type of land is allowed for installing the renewable energy power plants under Component-A of the PM-KUSUM Scheme? | Barren land and cultivable land on stilts |
| Which component of the PM-KUSUM Scheme is specifically designed for solarizing existing grid-connected agriculture pumps? | Component-C |
| The full form of PM-KUSUM is___. | Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan Yojna |
| Component-B of PM KUSUM scheme is applicable in which areas? | Off-Grid area |